Locator Hist Soc - HS-D02324 Type Drawing Doc Number 10059
Description Sheet 5, Highway Bridge Over Tail Track,Vicker's Coaling Station, Vicker VA
Notes Situation Plan, Longitudinal Section (road profile), details of timber trestle bents and floor beams. Penciled-in note that concrete aburtments were used instead of timber supports.
Date 04/25/1918 Revision Date  
Author N&W Rwy - Office Chief Engr Accession 2005.004 : Library of Virginia

Sheet 5, Highway Bridge Over Tail Track,Vicker's Coaling Station, Vicker VA

Size: 35in x 24in (90cm x 62cm)

Related 10059 Hist Soc - HS-D02325 Sheet 5A, Highway Bridge Over Tail Track,Vicker's Coaling Station, Vicker VA
 Situation Plan, Details of concrete abutments.
Related 10059 Hist Soc - HS-H00210 Sheet 3, Proposed Overhead Coaling Bridge, Vicker VA, MP 295+3055'.
 Scale 1"=4'. Plan and east elevation of coaling bridge with approach trestles; details of trestle bents.
Related 10059 Hist Soc - HS-H00208 Sheet 1, Proposed Overhead Coaling Bridge, Vicker VA, MP 295+3055'.
 Scale 1"=4'. East Side and North End elevations.
Related 10059 Hist Soc - HS-H00209 Sheet 2. Proposed Overhead Coaling Bridge, Vicker VA, MP 295+3055'.
 Scale 1"=4'. Top Plan and cross section of main coaling portion of bridge.
Related 10059 Hist Soc - HS-H00211 Sheet 4, Proposed Overhead Coaling Bridge, Vicker VA, MP 295+3055'.
 Scale 1"=4'. Situation Plan and profile of entire coaling station including approaches and changes to main tracks.
City Vicker - VA
Structure Engine Service - Coaling
Structure Bridge - Highway
Structure Station - Coaling
Structure Bridge - Overhead Highway
Company N&W Rwy - Norfolk & Western Railway
Division N&W Rwy - Radford - 295.7